Imageboard item writing the swirly wave into specification: cross-twice and repositions are mostly from the power source
Only the voltage is specified, not the ripple. After powering on, it is difficult to track the horizontal lines. The project proposal should list the power supply tree and the ripple upper limit.。
Read more →
